Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jun 15, 2022     Intake snorkel - (3.6 hours)       Category: Firewall Forward
1. Fitted the intake snorkel into position on the front of the fuel servo, and checked all sides of it for interference. Identified and marked several locations that will have to be cut out and re-glassed with a small clearance blister:
a). Aft alternator mounting bolt,
b). Left mounting tab on the starter,
c). Mixture arm on the fuel servo.
2. Measured and cut a template out of thin cardboard that will be used to locate the four mounting holes that will attach the snorkel to the fuel servo.
3. Leveled the snorkel, then leveled the template and clamped it in place.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.